New KOREC case study – Greenhatch Group

The accuracy of the Trimble SX10 lends itself to a challenging cliff top survey in Tintagel as a new bridge linking the headland and the ruins of the 13th century castle nears completion. Many thanks to Jordan Knight of The Greenhatch Group for supplying the information and images. Read the…

The accuracy of the Trimble SX10 lends itself to a challenging cliff top survey in Tintagel as a new bridge linking the headland and the ruins of the 13th century castle nears completion.

Many thanks to Jordan Knight of The Greenhatch Group for supplying the information and images.

Read the full case study here.