A multi-sensor approach to critical bridge works
IO Geomatics combines over 27 years of topographical expertise with an extensive survey portfolio that allows them to apply the most effective methodologies for each site’s specific challenges. A recent...
Delivering exceptional survey detail for steel fabricators on railway bridge strengthening works and tunnel infrastructure
Working in tandem with Bidston Surveys and their Trimble X7 on Camberwell Railway Bridge
Craftsmanship meets precision
How WM Ironwork’s use of Tekla Structures led them to introduce the Trimble X9 3D laser scanner into their workflow, increasing their abilities tenfold by significantly reducing rework and improving...