New KOREC case study – Felix O’Hare
Thank you Wayne Nolan for sharing your thoughts on BIM and the Trimble RTS773 and FieldLink system. This case study looks at the adoption of 3D setting-out technology by Felix O’Hare with Senior Site Engineer Wayne Nolan and Rori Millar, Head of Digital Contraction sharing some interesting thoughts. Read the case study here.
Read Article